The Bucharest Architecture Annual » Projects » Edition 2010 » Architecture
ro | en

Improvement of Traffic Conditions in Obor Passage - Tramway piers and subway access

Author: arch. Adrian NICOLAESCU
Coauthors: arh. Mădălina Trica, urb. Daniel Tudor, urb. Liliana Ionici, urb. Mihăiță Rotaru, structura: ing. I. Ștefănescu, ing. E. Fufezan, ing. Gh. Lazăr, ing. St. Kolozsvari, ing. A. Blaga.
Firm: METROUL SA


Related projects:

Edition 2013, Studies and Projects Section
Pajura Subway Station. Line 6. 1 Mai - Henri Coandă Airport
arch. Adrian NICOLAESCU
Edition 2013, Studies and Projects Section
Expoziției Subway Station. Line 6. 1 Mai - Henri Coandă Airport
arch. Adrian NICOLAESCU
Edition 2013, Studies and Projects Section
Montreal Subway Station. Line 6. 1 Mai - Henri Coandă Airport
arch. Adrian NICOLAESCU, arch. Mădălina TRICĂ
Edition 2013, Studies and Projects Section
Washinghton Subway Station. Line 6. 1 Mai - Henri Coandă Airport
arch. Adrian NICOLAESCU
Edition 2013, Studies and Projects Section
Paris Subway Station. Line 6. 1 Mai - Henri Coandă Airport
arch. Adrian NICOLAESCU
Edition 2012, Architecture - social and cultural Section
4 subway thoroughfare, Gara de Nord (North railway station) by-pass, Straulesti, Bazilescu station
arch. Adrian NICOLAESCU
Edition 2012, Architecture - social and cultural Section
4 subway thoroughfare, Gara de Nord (North railway station) by-pass, Jiului station
arch. Adrian NICOLAESCU
Edition 2010, Interior Design Section
Additional escalators for the correspondence between Victoriei Square 1 - Victoriei Square 2 stations
arch. Adrian NICOLAESCU
Edition 2010, Studies and Projects Section
Subway mainline 5 - section 1: Drumul Taberei - Universitate
arch. Adrian NICOLAESCU

2010
Architecture